Danone

Challenges Met

Work completed ahead of schedule, with no downtime on existing production.

Detour Gold Corporation

Challenges Faced

Complete the work within the schedule authorized by the client and quickly react to the additional labour that required the dispatch of 40 extra men. In order to prevent work accidents, our CNESST manager WSIB made sure that two safety meetings were held daily throughout the shutdown.

La Macaza

Construction of a drinking water plant at La Macaza Institution (Correctional Service Canada) Government of Canada


Challenges identified

Installation of two (2) new water intakes at a depth of ± 40 feet. Restricted work with prison security, inside a penitentiary.

Sainte-Agathe-des-Monts

Upgrading and increasing the treatment capacity of the wastewater treatment plant and overflow works for the city of Sainte-Agathe-des-Monts.


Challenges Met

Treatment capacity: 27,700 m³/d.

First advanced secondary treatment of wastewater flow settling.

City of Mirabel

Rehabilitation/increase in capacity of the Victor pumping station.


Challenges Met

Installation of a pumping station with a cage and a filtering tip.

Demolition of 60 MPA of concrete in a confined space over 35 feet deep.

Atwater Plant

Bringing the Atwater plant up to standard.


Challenges Met

Handling and various works on a 1,200 mm Ø pipe in a restricted area.

Olympic Park (Montreal)

Montreal Olympic Park Sports Center (Olympic Stadium)


Challenges Met

Rehabilitation of the Olympic Stadium’s aquatic basins.

CEZinc

Challenges Met

Carry out the work within the agreed upon schedule and quickly react to the unexpected need for additional work (that had not been considered beforehand) without adding men for labour. The experience and resourcefulness of the employees involved led to the success of this planned shutdown. The person in charge of the CNESST held two safety meetings daily throughout the shutdown, in order to prevent work-related accidents.

RAEBL

Upgrading of the La Prairie wastewater treatment plant.

Challenges Met

First wastewater disinfection system using ozone in Quebec.

By accessing the Shop, you are leaving Groupe Nordmec’s website and you are consenting to Création Style Plus using or sharing your personal information as described in their privacy policy.