Challenges Met
Work completed ahead of schedule, with no downtime on existing production.
Challenges Met
Work completed ahead of schedule, with no downtime on existing production.
Modernization work for the railcar unloading station (turnkey).
Challenges Met
This was a design, manufacture and installation project. The person in charge of the CNESST held a main meeting every week, as well as three (3) daily meetings, in order to prevent work accidents.
Challenges Met
Carry out the work within the authorized schedule by replacing the inner inconel shell. The person in charge of the CNESST held two safety meetings daily throughout the shutdown in order to prevent work-related accidents.