Univar

Industrial Sector

Specialized contractor
Annual maintenance
Year of realization: 2014-2015
Location: Salaberry-de-Valleyfield
Value of work: $790,000

Modernization work for the railcar unloading station (turnkey).


Challenges Met

This was a design, manufacture and installation project. The person in charge of the CNESST held a main meeting every week, as well as three (3) daily meetings, in order to prevent work accidents.

logoclients-univar

Description of the Project

Carry out mechanical process work:

  • Design and fabrication of a pumping station.
  • Installation of a column pump.
  • Design, fabrication and installation of a rack.
  • Fabrication and installation of stainless steel piping with food grade welds.
  • Design, fabrication and installation of piping on tanks.
  • Design and construction of a storage garage.
  • Design, fabrication and installation of an exterior aerial access walkway to the tank rows.