Domaine Privilège — Phase 1 Reserve Sector and Phase 2 Privilège Sector
-
2023-2024
-
Mont-Tremblant, Québec
This project enabled the client to benefit from optimized access and smooth circulation on the site. The construction of two new roads, totaling over one kilometre, provides safe infrastructure that meets modern standards and facilitates future site development.
The work carried out included:
- Clearing, stump removal, and stripping;
- Earthworks for shaping the infrastructure;
- Installation of drainage systems (culverts);
- Roadbed construction;
- Site development.
Project highlights:
- Steep terrain;
- Winter work required due to water-saturated, difficult-to-handle soil;
- Site development aligned with the developer’s vision, taking into account their needs and creating a tailored design.